Jump to content

Master Cylinder


Rolaspec

Recommended Posts

Members dont see this ad
  • Replies 31
  • Created
  • Last Reply

Top Posters In This Topic

One tip when welding lower KE70 spring perches onto strut with a greater O/S dia.

 

When you grind away the inside of the lower perch to fit snuggly over the 50mm dia strut, it does not leave a lot of metal on the perch at that point, where you need it to be welded to the strut. The original perches had a "turn down" at that point where, it met the strut, but you will have ground that off in this opening up hole process.

 

I found a 2" dia. metal ring at the hardware store, that was actually part of an agricultural gate latch fitting. I careful filed all the galvanising off it, then carefully filed the inside dia. about 0.5 mm, until is was a snug slide down the 51mm strut tube. It was welded onto the strut tube, with about 4 off stitch welds, so as not to distort the tube. Then slide the lower perch down onto the ring and weld perch to ring & strut tube.

 

Created a very strong welded joint, probably as good or better than the original.

 

post-270-0-79952500-1457051066_thumb.jpg

 

Cheers Banjo

Edited by Banjo
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...

×
×
  • Create New...