The plumbers at work were drilling another hole in the slab on the floor above today (Floors 4 to 5). So just like last week when they drilled through the slab between floors 1 and 2, they cut the main power cables. Then not to mention all the water from their drill filling up all the power cable tubes, then pouring from the slab above wetting the whole pile of plasterboard sheets on the floor.
Pretty phucked.