May 25, 201115 yr comment_526786 Just read the whole thread, and this is f@#k!ng awesome! I thoguht about looking into convo pro's earlier but this just confirmed that I should get some for the 55 myself! :wink: Hows the car now? any progress? Report
June 6, 201115 yr Author comment_529987 Hey guy its been a while since i've done a update things are still moving along slowly i've been playing around with the turbo manifold wastegate and dump pipe Edited July 31, 201412 yr by 1JZKe55 Report
June 6, 201115 yr comment_530102 Think that's the longest dump pipe I ever seen! looks tough as dude, keep it up! Report
June 8, 201115 yr Author comment_530455 Ha thanks guys :P Started playing around with the dump pipe for the 50mm wastegate today Report
August 16, 201115 yr comment_546911 This looks wicked.. Great work on this one mate.. can't wait till its fully completed and ripping up the track! Report
August 16, 201115 yr comment_546991 Think that's the longest dump pipe I ever seen! looks tough as dude, keep it up! gotta be probably the shortest cooler pipes Ive ever seen !!!! Report
August 18, 201115 yr Author comment_547494 gotta be probably the shortest cooler pipes Ive ever seen !!!! Ha gold :P Yeah its to try and keep the lag down as much as possible with such a big intercooler Getting ready to do the hydraulic hand brake and the brake/fuel lines through out the car as well as getting some more kw out of the super charged rolla like 126rwkw isn't enough :lmao: Report
August 19, 201115 yr comment_547646 Instesting design that manifold, but to clear everything also, clever really Keep up the good work mate Report
August 21, 201115 yr Author comment_548048 Instesting design that manifold, but to clear everything also, clever really Keep up the good work mate Cheers mate Yeah that manifold lol just don't ask what bit of agricultural equipment i got the idea from :lolcry: it should flow ok tho i can see neil wanting a bigger turbo once he starts looking for more kw so probably end up with a new manifold too Report
August 30, 201115 yr Author comment_550206 sad to say but this project is having to be moved into storage and on hold until further notice to make room for an up and coming crash repair shop. :bash: Ha i'm not touching that car neil i don't want to know anything about it :rolls: the new job is bad enough working 6 days a week Edited August 30, 201115 yr by 1JZKe55 Report
August 30, 201115 yr comment_550211 sad to say but this project is having to be moved into storage and on hold until further notice to make room for an up and coming crash repair shop. :bash: That really sucks mate. Hopefully it comes out of storage at some point and gets finished off. Report
August 30, 201115 yr Author comment_550218 He's just found a new daily driver that needs a bit of front end work lets just say :lolcry: Yeah the 1j will still be worked on things will just happen a little slower if that's possible new job doesn't really leave me much time to do anything these days Edited August 30, 201115 yr by 1JZKe55 Report
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now