September 16, 201115 yr comment_554020 If the ports are just round, hole saw slightly smaller then file/dremel out to the required diameter? Impressed with how fast you're moving. I'm half expecting it to be running in a month :P Report
September 16, 201115 yr Author comment_554022 Yeah I was thinking I could weld it up with no holes cut there and drill after. Might take more heat then. Report
September 16, 201115 yr comment_554024 or you could just put it on the mill later, I would be happy to skim it for you, then you can just go nuts when you weld it, got to watch out for your O-ring end though Report
September 16, 201115 yr comment_554030 Hopefully you got my email Matt, this will be sent off with my other gear on monday. I am getting 80 flanges cut for the trumpets/velocity stacks I sell and a prototype of something else. Speaking of which how will your clearence be from your throttles to the inside of the bonnet? damn it would be awesome if I made some 310mm trumpets and you stuck them out of the bonnet! Report
September 16, 201115 yr Author comment_554031 Hahaha, nah no trumpets out the bonnet for me. I'm just gonna shoot them over the brake booster, I will make the manifold drop the angle by 2 or 3 degrees. Report
September 17, 201115 yr comment_554077 Really nice progress here, moving along very quick. Probably a good idea to go thicker though to allow for warpage when you weld, aluminum warps like crazy Definately this, 10mm minimum, and you will still need to skim the face. Report
September 17, 201115 yr Author comment_554088 Really nice progress here, moving along very quick. Definately this, 10mm minimum, and you will still need to skim the face. Yeah sam has sent me a pdf of the exact layout spaced like I need. So I can't wait till the plate is done. Sams doing it with his next batch of machining. Gonna most likely run with that in the end. Want to buy some silvertop itbs if anyone has them lying around. Send me a pm. Especially brissy locals. :laff: Report
September 17, 201115 yr comment_554097 I have some spare, and I can mod them for you in advance, however no TPS also the flanges will be water cut, I think I will go 10mm thick. Will be water cut, even the holes. Report
September 18, 201115 yr Author comment_554260 Cheers Sam, theres another guy whos sorted me out with the actual throttles already but Id still love/need your help on the linkages if thats ok. Report
September 18, 201115 yr comment_554263 happy to do so, and having the plate here will make it easy. Send me a reply to that email so I may give you my address Report
September 18, 201115 yr Author comment_554267 Sent you an email mate. The gentleman with the throttles is in Melbourne if you wanna work on the exact units I will use. Report
September 18, 201115 yr comment_554432 well I didn't think I would be posting an update for this thread but why not. Flange is going to get cut tomorrow or tuesday, likely to be picked up on wednesday and I still have the tapping head in my mill so I can quickly tap the mounting holes out. The throttles will likely be dropped off later in the week for which I will modify the tabs to suit. The flange design looks the part and I look forward to seeing how it works it. Report
September 20, 201115 yr Author comment_554935 Sams awesome contribution to the inlet manifold. Report
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now